Septic to Sewer
Project Background
As a result of the Florida Springs and Aquifer Protection Act signed into law by the Governor in July, 2016, Hernando County was tasked to find ways to comply with the requirements associated with the 2016 legislation and developed restoration plans (BMAPS). The Septic to Sewer Conversion Plan is Hernando County Utility Department's (HCUD) response to the state mandated Onsite Sewage Treatment and Disposal System Remediation Plan requirement for Weeki Wachee Springs (more detailed information can be found under Project Overview on side panel).
Septic to Sewer FAQs![]() |
| ATTENTION |
|
Project Background
As a result of the Florida Springs and Aquifer Protection Act signed into law by the Governor in July, 2016, Hernando County was tasked to find ways to comply with the requirements associated with the 2016 legislation and developed restoration plans (BMAPS). The Septic to Sewer Conversion Plan is Hernando County Utility Department's (HCUD) response to the state mandated Onsite Sewage Treatment and Disposal System Remediation Plan requirement for Weeki Wachee Springs (more detailed information can be found under Project Overview on side panel).
Septic to Sewer FAQs![]() |
| ATTENTION |
|
-
Project Update - February 13, 2026
Share Project Update - February 13, 2026 on Facebook Share Project Update - February 13, 2026 on X (formerly Twitter) Share Project Update - February 13, 2026 on Linkedin Email Project Update - February 13, 2026 linkWeek of February 13, 2026 – February 20, 2026
Important Project Information:
Right of Way Cleanups: Sewer Shed 2
Sod Restoration: Sewer Shed 2
Paving Completed: Swan Ln, Melshire Ave, Brentlawn St
-
Freeport Dr: Road will receive a final layer of pavement in the near future.
Week of February 13, 2026 – February 20, 2026
Important Project Information:
Right of Way Cleanups: Sewer Shed 2
Sod Restoration: Sewer Shed 2
Paving Completed: Swan Ln, Melshire Ave, Brentlawn St
-
Freeport Dr: Road will receive a final layer of pavement in the near future.
-
Project Update - February 6, 2026
Share Project Update - February 6, 2026 on Facebook Share Project Update - February 6, 2026 on X (formerly Twitter) Share Project Update - February 6, 2026 on Linkedin Email Project Update - February 6, 2026 linkWeek of February 6, 2026 – February 13, 2026
Planned Work Activities:
Sewer Testing Completed: Brentlawn St, Melshire Ave, Swan Ln
Roads to be Paved: Freeport between Sardinia Ave/Sunday Rd, Brentlawn St, Melshire Ave, Swan Ln (Weather dependent)
Sprinkler Restoration: Lynnhaven Rd, Montebello Ln, Seahorse Ave
-
Right of Way Cleanups: Sewer Shed 2
Week of February 6, 2026 – February 13, 2026
Planned Work Activities:
Sewer Testing Completed: Brentlawn St, Melshire Ave, Swan Ln
Roads to be Paved: Freeport between Sardinia Ave/Sunday Rd, Brentlawn St, Melshire Ave, Swan Ln (Weather dependent)
Sprinkler Restoration: Lynnhaven Rd, Montebello Ln, Seahorse Ave
-
Right of Way Cleanups: Sewer Shed 2
-
Project Update - January 30, 2026
Share Project Update - January 30, 2026 on Facebook Share Project Update - January 30, 2026 on X (formerly Twitter) Share Project Update - January 30, 2026 on Linkedin Email Project Update - January 30, 2026 linkWeek of January 30 – February 6, 2026
Planned Work Activities:
Building Roads: Brentlawn St, Lynnhaven Rd, Melshire Ave, and Swan Ln
Paving Roads: Brentlawn St, Freeport Dr, Lynnhaven Rd, Melshire Ave and Swan Ln
Forcemain ARV Work: Freeport Dr, Lynnhaven Rd, Montebello Ln and Mountain Way Ave
Restoration: Sewer Shed 2
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
Week of January 30 – February 6, 2026
Planned Work Activities:
Building Roads: Brentlawn St, Lynnhaven Rd, Melshire Ave, and Swan Ln
Paving Roads: Brentlawn St, Freeport Dr, Lynnhaven Rd, Melshire Ave and Swan Ln
Forcemain ARV Work: Freeport Dr, Lynnhaven Rd, Montebello Ln and Mountain Way Ave
Restoration: Sewer Shed 2
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
-
Project Update - January 23, 2026
Share Project Update - January 23, 2026 on Facebook Share Project Update - January 23, 2026 on X (formerly Twitter) Share Project Update - January 23, 2026 on Linkedin Email Project Update - January 23, 2026 linkWeek of January 26 – January 30, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Roadway Restoration: Brentlawn St, Freeport Dr and Melshire Ave
Concrete Driveway Restoration: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Miscellaneous Restoration / Irrigations Repairs: will occur in the Sewer Shed 2 area
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
Week of January 26 – January 30, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Roadway Restoration: Brentlawn St, Freeport Dr and Melshire Ave
Concrete Driveway Restoration: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Miscellaneous Restoration / Irrigations Repairs: will occur in the Sewer Shed 2 area
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
-
Project Update - January 16, 2026
Share Project Update - January 16, 2026 on Facebook Share Project Update - January 16, 2026 on X (formerly Twitter) Share Project Update - January 16, 2026 on Linkedin Email Project Update - January 16, 2026 linkWeek of January 19 – January 23, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Roadway Restoration: Brentlawn St, Freeport Dr and Melshire Ave
Concrete Driveway Restoration: Brentlawn St and Freeport Dr
Fine Grading and Restoration will occur throughout the week as conditions allow.
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
Week of January 19 – January 23, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr, Melshire Ave and Swan Ln
Roadway Restoration: Brentlawn St, Freeport Dr and Melshire Ave
Concrete Driveway Restoration: Brentlawn St and Freeport Dr
Fine Grading and Restoration will occur throughout the week as conditions allow.
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
-
Project Update - January 9, 2026
Share Project Update - January 9, 2026 on Facebook Share Project Update - January 9, 2026 on X (formerly Twitter) Share Project Update - January 9, 2026 on Linkedin Email Project Update - January 9, 2026 linkWeek of January 12 – January 16, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr and Melshire Ave
Roadway Restoration: Freeport Dr
Sod Installation: Freeport Dr and Sunday Rd
Fine Grading and Restoration will occur throughout the week as conditions allow.
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
Week of January 12 – January 16, 2026
Planned Work Activities:
Gravity Installation: Brentlawn St, Freeport Dr and Melshire Ave
Roadway Restoration: Freeport Dr
Sod Installation: Freeport Dr and Sunday Rd
Fine Grading and Restoration will occur throughout the week as conditions allow.
Important Notice for Residents
Construction signs (shown below) will be placed in the front yards of affected properties one day prior to scheduled pipe installation.
During this time, driveway access will be temporarily restricted.
-
Project Update - December 19, 2025
Share Project Update - December 19, 2025 on Facebook Share Project Update - December 19, 2025 on X (formerly Twitter) Share Project Update - December 19, 2025 on Linkedin Email Project Update - December 19, 2025 linkHoliday Schedule Updates
Contractors will be off beginning Wednesday, December 24th 2025 and return Monday, January 5th 2026.Crews will be cleaning up - Monday, December 22nd and Tuesday, December 23rd.There is a possibility some restoration work will be occurring during the break.
Holiday Schedule Updates
Contractors will be off beginning Wednesday, December 24th 2025 and return Monday, January 5th 2026.Crews will be cleaning up - Monday, December 22nd and Tuesday, December 23rd.There is a possibility some restoration work will be occurring during the break.

-
Project Update - December 12, 2025
Share Project Update - December 12, 2025 on Facebook Share Project Update - December 12, 2025 on X (formerly Twitter) Share Project Update - December 12, 2025 on Linkedin Email Project Update - December 12, 2025 linkGravity Install, Gravity Services Install and Roadway Restoration will continue on Freeport and Lynnhaven.
Driveway Restoration - Lorraine, Lynnhaven and Sunday - 12/15 and 12/16
Paving/Sod Restoration is TENTATIVE - Lorraine, Seahorse and Sunday - 12/15 till 12/19
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Barricades will be put up ahead of the work areas to discourage through traffic. As always, local residents will be allowed passage beyond the barricades.
Gravity Install, Gravity Services Install and Roadway Restoration will continue on Freeport and Lynnhaven.
Driveway Restoration - Lorraine, Lynnhaven and Sunday - 12/15 and 12/16
Paving/Sod Restoration is TENTATIVE - Lorraine, Seahorse and Sunday - 12/15 till 12/19
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Barricades will be put up ahead of the work areas to discourage through traffic. As always, local residents will be allowed passage beyond the barricades.
-
Project Update - December 5, 2025
Share Project Update - December 5, 2025 on Facebook Share Project Update - December 5, 2025 on X (formerly Twitter) Share Project Update - December 5, 2025 on Linkedin Email Project Update - December 5, 2025 linkConstruction will begin on Freeport Dr and Lynnhaven Rd (next week) on Monday, December 8th 2025.
Sunday Road has been completed. Cleanup will be ongoing throughout the next week.
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Barricades will be put up ahead of the work areas to discourage through traffic.
As always, local residents will be allowed passage beyond the barricades.
Construction will begin on Freeport Dr and Lynnhaven Rd (next week) on Monday, December 8th 2025.
Sunday Road has been completed. Cleanup will be ongoing throughout the next week.
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Barricades will be put up ahead of the work areas to discourage through traffic.
As always, local residents will be allowed passage beyond the barricades.
-
Project Update - November 14, 2025
Share Project Update - November 14, 2025 on Facebook Share Project Update - November 14, 2025 on X (formerly Twitter) Share Project Update - November 14, 2025 on Linkedin Email Project Update - November 14, 2025 linkGravity install is scheduled to resume Monday (November 17th) on Lynnhaven Rd.
Irrigation restoration has started on Freeport Dr, Mountain Way Ave, Northvale St, Montebello Ln. (Sewer Shed 6 Area)
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Electronic road signs on Freeport Dr are mainly for thru traffic on weekends, night time etc.
Barricades will be put up ahead of the work areas to discourage through traffic.
As always, local residents will be allowed passage beyond the barricades.Gravity install is scheduled to resume Monday (November 17th) on Lynnhaven Rd.
Irrigation restoration has started on Freeport Dr, Mountain Way Ave, Northvale St, Montebello Ln. (Sewer Shed 6 Area)
Signs (shown below) will be posted in the front yards of properties the day before scheduled pipe installation will restrict driveway access for residents.

Electronic road signs on Freeport Dr are mainly for thru traffic on weekends, night time etc.
Barricades will be put up ahead of the work areas to discourage through traffic.
As always, local residents will be allowed passage beyond the barricades.
-
CH
Phone 352-540-4368 ext 35130 Email chiggins@hernandocounty.us -
JB
Phone 352-540-4368 ext 35859 Email jbedingfield@co.hernando.fl.us
-
Click here to play video
How Septic Systems Impact Springs
Take 90 seconds to learn how septic systems can affect the springs.
-
Click here to play video
Florida's Aquifer Adventure
Video discusses Florida's aquifer and related topics
@13:50 How contaminants affect the springs & aquifer
@16:35 Springs Initiative